2018 Level-4 Term-I exam on Apparel Production Management (AME 453) from BUTEX affiliated colleges, 105 marks. Candidates solved line balancing for polo shirts, modular manufacturing details, SMV-based weekly load and capacity calculations, and work study procedures.
Level-4 Term-I, Final Exám-2018
Subject: Apparel Production Management (Code: AME 453)
Time: 3.0 Hrs. Full Marks: 105
(Use separate answer script for Part: A and Part: B)
(All parts of a question must be answered consecutively)
Part: A
(Answer any three questions)
1. (a) What is you meant by line balancing? State the necessity of line balancing in Apparel industry. .
(b) Describe the line balancing process for polo-shirt.
(c) What is production and productivity? Explain the causes of law productivity in Apparel industry.
[5.5+6+6=17.5]
2. (a) What is production planning and production control?
(b) Write the comparison between production planning and production control.
(c) Which production system is mostly used in Bangladesh garments industry? Write the features with merits and demerits of this system.
(d) What is line Balancing? Describe the steps in line balancing.
[2+5+5.5+5=17.5]
3. (a) Write details about Modular manufacturing system.
(b) Differentiate between PBS and UPS.
(c) What is work study? Why work study is very essential in apparel sector?