Apparel Production Management exam (AME-453) from BUTEX affiliated colleges' 2017 Level-4 Term-I finals, carrying 105 marks. Questions cover production planning versus control, work and time study tools, WIP impacts, operator productivity numericals, and WRAP compliance.
Level-4 Term-I, Final Exám-2017
Subject: Apparel Production Management (Code: AME-453)
Time: 3.0 Hrs. Full Marks: 105
(Use separate answer script for Part: A and Part: B)
(All parts of a question must be answered consecutively)
Part: A
(Answer any three questions)
1. (a) What is production planning and control?
(b) Write the comparison between production planning and production control.
(c) Which production system is mostly used in Bangladesh garment industry? Write the features with merits and demerits of this production system.
(d) What is line balancing? Describe the steps in line balancing.
[2+5+5.5+5=17.5]
2. (a) What is work study, time study, SMV, and FOB?
(b) Explain the basic procedure of work study.
(c) Why do we use method study?
(d) Mention the tools of time study.
[4+5.5+5+3=17.5]
3. (a) What is Productivity? Why doses Bangladesh Apparel Industry face productivity loss in production?
(b) What does it mean by having high 'WIP? What impact does it create on cutflow?